Ir. Gary Ng

Construction Director, Malaysia Rail Link Sdn Bhd


short
biography

Ir. Gary Ng Ng Fook Kwai graduated from Texas A&M University with a master’s degree in civil engineering, PE, Asean PE and qualified PMP with 37 years of working experience in various multibillion mega railways, highways and tunnels projects. He has been involved in project management, design, design coordination, construction supervision, Independent Checking Engineer and contracts administration both in Malaysia as well as in USA, Cambodia and Indonesia. He been exposed to and involved in the organisation of client, PMC, Consultant and contractor working environment. His past projects were : Sg Piah Hydro Electric Tunnels, Changkat Jering Toll Expressway, North South Expressway (Package 6), Menora D&B Tunnel, Texas US 75 TBM Storm Tunnel, Ipoh- Lumut Highway, Kesas Expressway, Kuala Lumpur Putra LRT Tunnels/Undeground stations, Ipoh-Rawang Electrified Double Track, KLJ LRT Extension, AMG LRT Extension, KL Women & Child Hospital, LRT 3 Tunnel/Underground Station , Jakarta LRT Phase I, Phnom Penh-Sihanoukville Toll Expressway ( Cambodia) and ECRL Project. He is currently the Technical (Infra Design and Construction) Director representing the client at the RM44 billion ECRL Project.